GAP驗廠介紹,GAP驗廠質量審核標準(四)
GIS QA Technical Evaluation Scope
CONFIDENTIALITY: The information, comments and opinions contained in the report including any and all attached photographs, copies of reports and similar documents are for the use of the Gap Inc. business units and its subsidiary companies. Do not distribute or photocopy this report without receiving prior written consent from GIS VQM department.
Section |
Q no. |
Question |
Management 管理 |
1 |
Factory manager and Department Managers have computerized system to access reports highlighting production output and efficiencies, quality control performance, order status and other essential and helpful data to properly manage factory operations. 工廠廠長和部門經理是否可用計算機系統訪問或輸入產量和效率、品質表現、訂單狀態以及其它必要和有利的數據,根據這些信息來妥善管理工廠的運作。 |
Management |
2 |
Management has an internal system to work with their suppliers on evaluation the material quality performance and work out pro-actively to prevent raw material/trim/semi-product quality issues. 是否有一個內部管理系統與供應商一起評估物料品質性能,以防止原材料/輔料/半成品質量問題的發生? |
Management |
3 |
Are there qualified and enough DA available and can be appointed for full empowerment under all necessary criteria's that we required as per DA manual? E.g.. Camera, desktop computers, WIP information, MRP preparation etc. 是否有足夠及合格的DA ,在所有必備條件的前提下能夠授權提供我們所要求的? 如:照相機、臺式電腦、WIP信息、MRP準備計劃等? |
Management |
4 |
- Is there merchandiser on site who can perform translation of all English documents to local language correctly and promptly? 現場的業務員是否能準確及時地把所有英文資料翻譯成中文? |
Management |
5 |
What is the quality mind set of the factory management staff and their reaction when there is a CAP / suggestions during the visit? 工廠的管理人員在訪問期間提出的問題有什么改善行動或建議? |
Management |
6 |
There is proper planning/hiring/ training for all the merchandisers / supervisor / DA / workers including documentation/ technical / Mansell eye testing / Color-blindness test to ensure they are qualified for the job assigned to meet buyer order requirement consistently. 是否有合理的招聘和培訓計劃,在資料文件方面培訓所有的業務員/主管/DA/工人,同時也要對他們進行視力測試/色盲測試,確保他們能勝任所在崗位工作,同時始終滿足客人訂單要求? |
Section
Q no.
Question
Sweater - Yarn
1
Is the winded yarn in correct threading,
tension and pass wax evenly and consistently on similar weight and
circumference across all cones with clear label?
Sweater - Yarn
2
Is there procedure in place to ensure that
white and light shaded yarns are kept separate from dark colors on winding
heads and divided sections are available to separate winding of white and
light shaded yarn from dark colors?
Sweater - knitting
3
Do all works have the approved written
procedures explaining the knitting sequence and the amount of weights
required for each style, coarse/inch, wale/inch, panel width and weight (for
hand frame machines)? Are the automatic knitting machines properly set (for
auto machines)?
Sweater - knitting
4
Is in-line inspection conducted on panels, for
basic measurement and general quality, such as holes, etc.?
Sweater - knitting
5
Are inspection area well organized and well lit
(800+) lux?
Sweater - knitting
6
Are there controls and markings in place to
ensure shade consistence of same piece garment?
Sweater - knitting
7
Is there knitting tension checking with
machine? How freq is it checking with record? Is there machine used for
tension checking?
Sweater - knitting
8
Is there checking of linking yarn strength
before release to workers?
Sweater - knitting
9
What is the ratio of table checker vs. linking
workers? Is it 100% check and mend before washing?
Sweater - knitting
10
What is the ratio of light tube checking vs.
linking workers before washing? Is it 100% check?
Sweater - mending
11
Is the ratio of the Mending/ Stitching workers
to Linking workers appropriate based on the production and the complexity of
the styles? (Line balancing).
Sweater - mending
12
Are Mending/ Stitching worker skillful?
Sweater - mending
13
Is there effective 100% check after mended
garment? Is the mending and checking separately by different workers?
Sweater - mending
14
Are mending sections well organized and well
lit (800 or above) lux?
Sweater - mending
15
Is there needle control process effectively
monitoring?
Section
Q no.
Question
Add#2 Product
Safety
1
Is there appointed Product Safety Officer (PSO)
checking 100% production site in monthly basis and submit GIS Product Safety
Compliance Checklist as per GIS requirement?
Add#2 Product
Safety
2
Is metal free zone under well control in sample
room, the whole production floor and QC room?
Add#2 Product
Safety
3
Is there regularly checking and maintenance of
the mold and machine for snaps/rivets…etc. so factory ensure 100% that the
molding process is compliance?
Add#2 Product
Safety
4
Is broken needle log checked, verified and
maintained the records properly?
Add#2 Product
Safety
5
Is Pull Test equipment available and correctly
performed to test the attachment strength of snaps/rivet/ small parts?
Add#2 Product
Safety
6
Is Needle Detector function correctly and
correctly performed by 9 point checking and record complete 3 times per
shift?
(1.2 mm sensitivity)
Add#2 Product
Safety
7
Is the metal free zone properly controls of all
metal/tools/ hard tag with limited authorizes person to enter?
Add#2 Product
Safety
8
Is Button Control Procedure checked, verified
and maintained the records properly?
Section |
Q no. |
Question |
Add#3 Printing/Plating |
1 |
Are buyer's approved samples/Tech Pack/ trim cards provided as guides for operators? |
Add#3 Printing/Plating |
2 |
Is printing/plating automatic or manual ( including drying) and machines/spare parts in correct setting, well maintained and clean? |
Add#3 Printing/Plating |
3 |
Are screens made in-house or contracted to outside source? |
Add#3 Printing/Plating |
4 |
Is there organized and controlled storage area for chemicals and MSDS sheet display and all the workers well trained to follow the SOP accordingly? |
Add#3 Printing/Plating |
5 |
Are in-process and finished pieces inspected in hourly basis in enough lighting to ensure consistency in Print Quality ? |
Add#3 Printing/Plating |
6 |
How are seconds replaced before releasing back to production workflow? |
Add#3 Printing/Plating |
7 |
Is the working environment/ housekeeping /tray/ racks/ trolleys/ tables/aisles clean and tidy?
|
Section |
Q no. |
Question |
Add#4 Embroidery |
1 |
Does the factory have adequate embroidery machines to fulfill the overall production capacity? |
Add#4 Embroidery |
2 |
Are embroidery machines properly maintained, regularly cleaned and serviced, and in good working condition? |
Add#4 Embroidery |
3 |
Are in-process and finished pieces inspected and seconds replaced before releasing back to production workflow? Are there proper control of deviations per load? |
Add#4 Embroidery |
4 |
Is thread SPI/tension well monitored and controlled, and thread ends properly trimmed? |
Add#4 Embroidery |
5 |
Does the embroidery facility have a broken needle control process and are all outgoing panels checked? |
Add#4 Embroidery |
6 |
Is there visual checking 100% and separate packed per shade in enough lighting when needed? |
Section |
Q no. |
Question |
Add#5 Laundry |
1 |
Is laundry capacity adequate in needed machine type to effectively support the overall production output? |
Add#5 Laundry |
2 |
Are machines adequately maintained so no steam/water leakage, no rusting or broken parts? |
Add#5 Laundry |
3 |
Is there checking of machine temp and RPM with record? Is there infra-red temperature checking device available? |
Add#5 Laundry |
4 |
Any calibrated measuring devices used? E.g. weight, beaker |
Add#5 Laundry |
5 |
Are laundry formulas, buyer approved samples in shade/hand feel & Tech Pack readily available for operators' and inspector's easy reference? |
Add#5 Laundry |
6 |
Is laundry managed by qualified technician / chemist? |
Add#5 Laundry |
7 |
Does laundry follow GAP PH & Crocking SOP? E.g. incoming water control, washing receipt control, testing of result, separation of wash lot, test per wash lot …etc. |
Add#5 Laundry |
8 |
Is there 100% visual/shade checking in correct light source and separately packed to return to next bulk process? |
Add#5 Laundry |
9 |
Is there measurement and hand feel checking per machine load with record? |
Add#5 Laundry |
10 |
Is there light box with buyer required light source available? |
如也有不清楚的可以隨時在線留言,我們致力于驗廠咨詢.認證體系輔導服務多年,累計幫助上萬家知名企業順利通過各種各樣驗廠和體系認證輔導。為廣大客戶提供一站式服務,機構遍布全國,無論是國內還是國外,都有我們公司的各個地區的輔導機構,且社會經驗豐富,老師專業,擁有諸多的人脈關系,可以為工廠提供高性價比的服務,避免找不到方向,讓制造廠安心、快速順利通過驗廠和認證審核。
便捷鏈接: HBI驗廠EcoVadisEcoVadis?認證咨詢化妝品驗廠化妝品認證咨詢GMPC驗廠GMPC認證咨詢RCS認證咨詢NBCU驗廠AEO認證咨詢AEOInditex驗廠Huawei驗廠華為驗廠PVH驗廠ESD認證咨詢ESDFSMAFSMA認證咨詢小米驗廠驗廠之家APPLE驗廠蘋果驗廠WRAP認證咨詢WRAP驗廠WRAPEICCICTI驗廠ICTI認證咨詢ICTISA8000認證咨詢迪士尼驗廠disney驗廠Walmart驗廠沃爾瑪驗廠認證咨詢驗廠BSCI驗廠BSCIWalmart認證咨詢WCA驗廠CVS驗廠RBA驗廠RBA認證咨詢GRS認證咨詢Huawei華為驗廠勞氏反恐驗廠Nike驗廠Lowe's驗廠McDonald驗廠LOREAL驗廠家樂福質量驗廠QSA驗廠ISO9001FCC認證咨詢ISO14001服務體系認證咨詢產品體系認證咨詢管理體系認證咨詢反恐驗廠質量驗廠社會責任驗廠EICC驗廠ICTI 驗廠OHSAS18001認證咨詢
本文來源:驗廠之家 - GAP驗廠介紹,GAP驗廠質量審核標準(四)
版權說明:上述為轉載或編者觀點,不承當任何法律責任